Tver Region
Tver Central Administrative Board includes:
- Tver CHPP-1;
- Tver CHPP-3;
- Tver CHPP-4;
- Vyshniy Volochek CHPP;
- Kamensk Steam boiler plant;
- Heat pipelines.
Total installed electric capacity (as of January 1, 2007) - 279 MW, installed heat capacity - 2,187 Gcal/h. Overall length of all transmission and distribution networks in Tver, Konakovo, Bezhetsk, Vyshniy Volochek amount to 120.3 km.
Energy sources perform electric supply of Tver Region consumers, that includes centralized heat supply of Tver, Konakovo, Bezhetsk, Vyshniy Volochek.