Tver Central Administrative Board
|
|
|
| Climate parameters |
| Average temperature in July, °C |
23 |
| Air temperature of the coldest 5 days, °C |
- 29 |
| Cold season duration, days |
218 |
| Average air temperature of the cold season, °C |
-3,0 |
|
|
| Installed electric capacity as of 11.05.2007, MW |
| Tver CHPP-1 |
17 |
| Tver CHPP-3 |
170 |
| Tver CHPP-4 |
88 |
| Vyshnevolockaya CHPP-1 |
4 |
| Kamensk boiler-house |
|
| Boiler enterprises of heat networks |
|
| Total for CAB |
279 |
|
| Installed heat capacity, Gcal\hour |
| Tver CHPP-1 |
178 |
| Tver CHPP-3 |
694 |
| Tver CHPP-4 |
620 |
| Vyshnevolockaya CHPP-1 |
124 |
| Kamensk boiler house |
54 |
| Boiler enterprises of heat networks |
517 |
| Total for CAB |
2187 |
|
Average annual generation, 2006.
| Electrical energy generation, mio. kWT\hour |
| Tver CHPP-1 |
68,136 |
| Tver CHPP-3 |
1100,961 |
| Tver CHPP-4 |
435,937 |
| Vyshnevolockaya CHPP-1 |
18,702 |
| Kamensk boiler-house |
--- |
| Boiler enterprises of heat networks |
--- |
| Total for CAB |
1623,736 |
|
| Heat supply, ths.Gcal |
| Tver CHPP-1 |
439,810 |
| Tver CHPP-3 |
1471,968 |
| Tver CHPP-4 |
1146,246 |
| Vyshnevolockaya CHPP-1 |
173,781 |
| Vyshnevolockaya boiler-house |
1,106 |
| Kamensk boiler-house |
159,062 |
| Boiler enterprises of heat networks |
628,975 |
| Total for CAB |
4020,948 |
|