Yaroslavl Central Administrative Board
|
|
|
| Climate parameters |
| Average temperature in July, °C |
23,2 |
| Air temperature of the coldest 5 days,°C |
- 31 |
| Cold season duration, days |
221 |
| Average air temperature of the cold season, °C |
-4,0 |
|
|
| Installed electric capacity as of 11.05.2007, MW |
| Yaroslavl CHPP-1 |
131 |
| Yaroslavl CHPP-2 |
325 |
| Yaroslavl CHPP-3 |
345 |
| Lyapinsk steam boiler-house |
- |
| Teninskaya water heating boiler-house |
- |
| Total for CAB |
801 |
|
| Installed heat capacity, Gcal\hour |
| Yaroslavl CHPP-1 |
697 |
| Yaroslavl CHPP-2 |
1185 |
| Yaroslavl CHPP-3 |
1665 |
| Lyapinsk steam boiler-house |
180 |
| Teninskaya water heating boiler-house |
420 |
| Total for CAB |
4147 |
|
Average annual generation, 2006.
| Power generation, mio. kWT\hour |
| Yaroslavl CHPP-1 |
471,932 |
| Yaroslavl CHPP-2 |
881,909 |
| Yaroslavl CHPP-3 |
1263,434 |
| Lyapinsk steam boiler-house |
- |
| Teninskaya water heating boiler-house |
- |
| Total for CAB |
2617,275 |
|
| Heat supply, ths.Gcal |
| Yaroslavl CHPP-1 |
1069,617 |
| Yaroslavl CHPP-2 |
1880,011 |
| Yaroslavl CHPP-3 |
2691,109 |
| Lyapinsk boiler house |
302,905 |
| Teninskaya water heating boiler-house |
266,764 |
| Total for CAB |
6210,406 |
|