Yaroslavl CHPP-2 expansion by installing gas-turbine unit GTE-160 and waste-heat boiler on the existing turbine PT-60-130/13
Project implementation provides:
- Dismantlement of the steam boilers of the first priority for installation GTE-160 and waste-heat boiler;
- Installation of the GTE-160 unit with waste-heat boiler for 9 MPa and 500-535°С steam conditions;
- Booster compression station installation;
- Steam turbine PT-60-130 reconstruction, switching to pulled-down parameters;
- Construction of open distribution unit ORU-220kV on the place of dismantlement cells 1 and 2 of the existing ORU-110kV. Construction of VL 220kV from CHPP along the dismantled VL 110kV VL#156
- Construction costs 2 171 million rubles.
Technical and economic performance before and after project implementation
| Year |
Fuel consumption rate for produced electricity, g/KWh |
Fuel consumption rate for generated heat, kg/Gcal |
Power supply from bus lines, in thous. KWh |
Heat supply from collectors, in thous. Gcal |
| 2006 |
375,6 |
144,9 |
734 329 |
1 880 011 |
| 2010 |
262,3 |
135,3 |
2 215 352 |
3 419 000 |
|